From Wembley Stadium in London to Novo Nordisk in Copenhagen. SiteCover has provided weather protection and cranes for a variety of construction sites and entertainment venues since 2015.  

Projects

ED SHEERAN
WEMBLEY STADIUM, LONDON, CROKE PARK, DUBLIN

SiteCover stood tall at Wembley and Croke Park for 5 concerts with +80.000 fans, intriguing music and beautiful scenery

VIEW PROJECT ›

NOVO NORDISK

ORAL DP LAUNCH PLANT IN MÅLEV, DENMARK

With Novo Nordisk ambitions to develop and deliver medicine to defeat diabetes and other serious chronic diseases, time is at the utmost importance. By covering the entire construction site from day 1, all risk imposed by weather was eliminated, and site management was able to fully focus on the challenging task of building the Novo Nordisk Oral DP plant.

VIEW PROJECT ›

NOVO NORDISK AUDITORIUM

In order to keep up with the set time schedule, covering up the construction site was needed. Being cheaper and more than twice as fast to install than traditional solutions, SiteCover was the obvious choice

VIEW PROJECT ›

DANISH TECHNICAL UNIVERSITY

Technical University of Denmark, building 205A.
A new 6-story building for high-class laboratory for veterinary research. SiteCover supplies shelter for bad weather, and adds security to the time schedule.

VIEW PROJECT ›

ELLEBO GARDEN ROOMS
BALLERUP, DENMARK

When KAB (a Copenhagen non-profit public housing authority) hired Ramboll to plan a complete renovation of the housing area “Ellebo”, Ramboll advised KAB to prescribe a SiteCover solution already in the tender material. Keeping water out of the existing flats, as new flats were added on the roof, was essential for the project to succeed.

VIEW PROJECT ›

BISPEBJERG HOSPITAL, LAB-LOG BUILDING

Already in the early stages of planning a new Laboratory- and Logistics-building for Bispebjerg Hospital, Copenhagen, the client decided that the project was to be implemented under the protection of SiteCover. Hosting both research- and clinical biochemistry laboratories, unintended moisture and mold deposits in the construction were a no-go.

VIEW PROJECT ›

BLADT INDUSTRIES
AALBORG, DENMARK

In Nov 2017, SiteCover signed a contract with Bladt Industries, to cover the production site for a substation for the Hornsea Project One Offshore Wind Farm – a DONG Energy project. SiteCovers first project in the windmill industry.

VIEW PROJECT ›



Because of the covering we are to cut 3 months of the time schedule

- Senior Project Manager, Ronan O’ Reilly, Client, Nyt Hospital og Ny Psykiatri Bispebjerg.


Producing on Aalborg Harbour from December 2017 to April 2018 without a single weather delay day

- Troels Jensen Senior Vice President, Bladt Industries


The biggest difference is the quality we will be able to deliver when the building is finished

- Senior Project Manager, Ronan O’ Reilly, Client, Nyt Hospital og Ny Psykiatri Bispebjerg.


Using SiteCover means that we are independent of the weather. We save money on expenses like drying out, and we have been able to start the interior work before the skylights on the roof has been completed

- Thor Christensen, Site Manager, Ramboll


It is a completely different way of constructing

- Senior Project Manager, Ronan O’ Reilly, Client, Nyt Hospital og Ny Psykiatri Bispebjerg.


Overhead cranes in the tent have significantly increased efficiency for handling and installation of equipment

- Troels Jensen Senior Vice President, Bladt Industries


One of SiteCovers advantages is the short assemble time. Compared to traditional scaffolding SiteCover only spend 1/3 of the time to assemble the structure

- Thor Christensen, Site Manager, Ramboll


Overhead cranes in the tent have significantly increased efficiency for handling and installation of equipment

- Troels Jensen Senior Vice President, Bladt Industries